Next free-source huntWe check for new free data every weekday.
EnergyMCP serverFirst audited Nov 13, 2026

Renewable Vision energy data

Saudi and regional energy data: registers, series, trackers, briefs; atlas layers need a member key.The vendor's description, from its MCP Registry listing.

Passed public checksAudited Nov 13, 2026

Every public check ran and passed. Public audit: we connect as an AI client would, list the tools and check what they say. We do not run them. How we audit

Does it work?
YesConnected in 245 ms.
Sign-up?
None neededIt answered without any account or key.
Can it change things?
No, read-onlyAll 28 tools say they only read.
Endpointhttps://renewablevision.com.sa/api/mcp

Website Streamable HTTP · protocol 2025-11-25 · server version 0.1.0

What we checked, the evidence, and the tools it offers.

What we checked

Security

  • Passed: Connections are encrypted (HTTPS).

  • Passed: No hidden instructions found in tool text.

Safety labels

  • Passed: Every tool says whether it only reads or can change things.

Tools

  • Passed: 28 tools listed.

  • Passed: Every tool describes its inputs with a valid schema.

Protocol

  • Passed: The MCP handshake works (Streamable HTTP).

  • Passed: Protocol version 2025-11-25 (latest).

  • Passed: Unknown requests are refused.

Connection

  • Passed: The server responds.

Tools (28)

As the server describes them. The labels are the server's own: it says whether each tool only reads or can change things.

  • list_datasetsThe catalogue of everything this platform publishes: each dataset with its id, title, topic, publisher, licence, coverage, record count, refresh cadence and the page it is published on; each mirrored…Read-only
  • get_registerRows from one official Saudi register as this platform last mirrored it. register: sppc (Saudi Power Procurement Company, the Principal Buyer — every solar and wind project with its contracted capaci…Read-only
  • search_projectsMatch a name, developer, country, region or city across the project trackers and return the matching rows with their capacities, largest first. dataset: renewables (Saudi renewable projects — technol…Read-only
  • get_companyOne developer or shareholder named in the Saudi Renewables Tracker, by the slug on its page (acwa-power, masdar, edf-renewables, saudi-aramco-power …; search_projects returns developers as published)…Read-only
  • get_seriesOne statistical series this platform mirrors from a publisher (the KAPSARC energy data portal, JODI, IRENA, the IMF, the IEA, the World Bank, Our World in Data, the CFTC, Climate TRACE, UN Comtrade),…Read-only
  • list_changesEvery row-level change this platform observed in an official register, a mirrored series or a tracker since a date, newest first, with the value on both sides and the size of the move. This answers "…Read-only
  • whats_dueThe publications and milestones this platform expects next: each mirrored source with the date its refresh is due and how many days late it is, and the tracked projects carrying a stated commercial o…Read-only
  • latest_briefThe current weekly energy brief: its subject, the figures it opens on, every block of its text and the permanent page for the week. Compiled every Sunday from the change ledger — what moved, what the…Read-only
  • get_briefOne week’s brief at its permanent address, by ISO week, e.g. 2026-W38. A brief never changes after the Sunday it was written, so it is safe to cite. Call list_briefs for the weeks published.Read-only
  • list_briefsEvery weekly brief published, newest first, with its ISO week, the Sunday it covers up to, its subject in both languages and its page. Use it to find the week to pass to get_brief.Read-only
  • list_reportsThe report library: every report this company has filed, newest edition first, with its id, title, summary, scope, sector, edition, the date its figures were compiled, page count and cover. Public fi…Read-only
  • get_reportOne report at its permanent address: the caption as prose, the definitions of its headline figures quoted from its own notes, its sources, the cover and the public preview pages. Its figures are as f…Read-only
  • power_balanceSaudi renewable capacity operational, under construction and tendered, against the 2030 National Renewable Energy Program target and against the Principal Buyer’s own register, with what changed sinc…Read-only
  • fleet_outlookThe week ahead for the tracked Saudi solar fleet: expected generation against the long-run normal, day by day, with the peak temperature forecast at the main load centres. Computed from an irradiance…Read-only
  • oil_balanceThis platform’s oil balance model run on its live inputs: the lever set, a summary, and the monthly path of anchor, price, band, demand, supply, stock change and inventories, with the source and stat…Read-only
  • solar_resourceThe long-run (2001–2020) NASA POWER climatology for one 0.5° cell (about 55 km): global horizontal and direct normal irradiance in kWh/m²/day, wind speed at 50 m in m/s, air temperature in °C and aer…Read-only
  • gcc_seriesAnnual country series for Saudi Arabia, the UAE, Oman, Qatar, Kuwait and Bahrain: installed solar, wind and renewable capacity (IRENA, MW); solar and wind generation (TWh), their shares of electricit…Read-only
  • news_mentionsRecent headlines on Saudi and GCC energy (renewables, storage, hydrogen, power, oil and gas, water, data-centre power), gathered every three hours from publishers’ own feeds and the GDELT Project: th…Read-only
  • searchRanked matches across the datasets, the mirrored series, the published insight articles and the tracked projects — the same index the site’s own command palette reads. Use it when you do not know whi…Read-only
  • project_output_estimateEstimated annual generation (GWh) and capacity factor of solar projects in the Saudi tracker, the GCC tracker and the Saudi captive segment, modelled with PVGIS (EU JRC) at the town or region centroi…Read-only
  • equipment_tradeImports into Saudi Arabia, the UAE, Oman, Qatar, Kuwait and Bahrain from 2015 of PV cells and modules, lithium-ion cells, wind turbines, static converters, electrolysis machines and large transformer…Read-only
  • gcc_emissionsNational greenhouse gas emissions of the six GCC states by year: Climate TRACE by sector (power, fossil-fuel-operations, manufacturing and others; MtCO2e, 100-year basis), the Climate Watch historica…Read-only
  • oil_outlookThis platform’s oil price and production strategy model: Brent today, the model’s monthly path for the next 24 months under current Saudi and OPEC+ policy (anchored to the EIA outlook and the futures…Read-only
  • oil_scenarioRuns one preset Saudi production path through the model and returns what it implies: Brent by month for 24 months and by year to 2050, Saudi crude exports, oil revenue, the fiscal balance against the…Read-only
  • find_projectsSearch and filter the whole project index, the one the site’s assistant reads: the Saudi, captive, GCC, Regional and World Renewables Trackers, Saudi battery storage, the Saudi, GCC, Regional and Wor…Read-only
  • aggregate_projectsCount projects, add up their stated capacity or their disclosed investment, grouped by country, place, stage, technology, sector, developer, year (of commercial operation) or source (tracker), option…Read-only
  • get_projectEverything the site holds on one project, by its id from find_projects, search_projects or a project page (/data/projects/{id}), whichever tracker lists it: name, sector, technology, capacity as stat…Read-only
  • tracker_summaryA tracker’s headline figures as its own page prints them, with the date they are true as of, read exactly as the site’s assistant reads them: projects and capacity by stage, and by country for the GC…Read-only

Audit history

  1. Nov 13Passed

What we sent

Every request in this audit, with the answer and how long it took. We never send credentials and never call a tool.

RequestAnswerTime
initializeHTTP 200245 ms
initializedHTTP 20241 ms
tools/listHTTP 200126 ms
resources/listHTTP 20048 ms
prompts/listHTTP 20044 ms
unknown-methodHTTP 20048 ms

Run this server, or disagree with the result?

Fix the issue and it shows in the next weekly audit, or email us to ask for a re-audit or to dispute a finding. Read how we audit for what each check means.